All states

Shielding requirements — Arizona

X-ray shieldingrequirements in Arizona.

Plain-language guidance for imaging facilities in Arizona — what to file, who regulates it, and where a shielding design fits in the process.

The short answer

A new facility files BRC-4. Each healing-arts X-ray machine gets its own BRC-4X. A new machine must be registered within 30 days after installation, and registration is not complete until the application fee is paid.

From our Arizona registration guide

The usual order of operations

01

Shielding design before construction

A qualified physicist calculates every barrier — walls, floor, ceiling, doors, and windows — for your exact equipment, layout, workload, and adjacent occupancy.

02

Register with the state

Radiation machines are registered with the state radiation-control program, usually before or as operations begin.

03

Build and install per the design

Your contractor builds to the material specifications in the shielding report — no guesswork at the job site.

04

Plan review and final checks

Where the state or local authority requires it, the report goes in for plan review; a post-installation survey closes the loop where required.

Requirements change and vary by project. The current rules of the responsible radiation-control authority always control — we confirm them for your project as part of every design.