Start with the room and the equipment
Confirm the exact modality and model before finalizing the room.
Use a current scaled plan with clear room dimensions.
Identify where the operator, patient, tube, detector, table, and control will be located.
Label every adjacent area, including tenant spaces, corridors, exterior areas, and floors above and below.
Document existing walls, slabs, ceilings, doors, windows, and penetrations.
Avoid false savings
Reusing an old room, copying a neighboring facility, or ordering shielding before calculations may appear faster. If the equipment, workload, occupancy, construction, or jurisdiction differs, those shortcuts can lead to excess material, insufficient coordination, delayed review, or rework.
Assign the regulatory tasks
Identify the project state and responsible agency early.
Confirm whether pre-construction plan review is required.
Assign equipment registration and facility paperwork.
Confirm whether a post-installation survey or inspection is required.
Schedule required steps before the planned opening date.
Build a simple decision chain
Use one current plan, one approved equipment selection, and one person responsible for routing changes. Bring the architect, contractor, vendor, and shielding designer together before walls are closed.
A practical next step
Start your project with Heartland Physics. Send the project state, current floor plan, equipment manufacturer and model, manufacturer planning documents, expected workload, room construction, and occupancy on every side - including above and below. Visit Heartland Physics to begin.
Requirements vary by state and project. This page is general planning information, not a shielding calculation, regulatory approval, or guarantee of compliance.
For Heartland Physics project inquiries, email Lancer@heartlandphysics.com.