All states

Shielding requirements — West Virginia

X-ray shieldingrequirements in West Virginia.

Plain-language guidance for imaging facilities in West Virginia — what to file, who regulates it, and where a shielding design fits in the process.

The short answer

West Virginia requires radiation machines to be registered with the Radiological Health Program before operation. The program lists Form 1R for radiation-machine registration and requires facilities to keep the machine registration current.

From our West Virginia registration guide

The usual order of operations

01

Shielding design before construction

A qualified physicist calculates every barrier — walls, floor, ceiling, doors, and windows — for your exact equipment, layout, workload, and adjacent occupancy.

02

Register with the state

Radiation machines are registered with the state radiation-control program, usually before or as operations begin.

03

Build and install per the design

Your contractor builds to the material specifications in the shielding report — no guesswork at the job site.

04

Plan review and final checks

Where the state or local authority requires it, the report goes in for plan review; a post-installation survey closes the loop where required.

Official West Virginia resources

Project in West Virginia?

$950 per room. Report in five business days. 90-day money-back guarantee.

Requirements change and vary by project. The current rules of the responsible radiation-control authority always control — we confirm them for your project as part of every design.