All states

Shielding requirements — Hawaii

X-ray shieldingrequirements in Hawaii.

Plain-language guidance for imaging facilities in Hawaii — what to file, who regulates it, and where a shielding design fits in the process.

The short answer

Hawaii requires a radiation facility license before acquiring, installing, possessing, or using electronic ionizing-radiation equipment. The state advises submitting the application and fee well before the planned installation because processing can take 30 days or more.

From our Hawaii registration guide

The usual order of operations

01

Shielding design before construction

A qualified physicist calculates every barrier — walls, floor, ceiling, doors, and windows — for your exact equipment, layout, workload, and adjacent occupancy.

02

Register with the state

Radiation machines are registered with the state radiation-control program, usually before or as operations begin.

03

Build and install per the design

Your contractor builds to the material specifications in the shielding report — no guesswork at the job site.

04

Plan review and final checks

Where the state or local authority requires it, the report goes in for plan review; a post-installation survey closes the loop where required.

Requirements change and vary by project. The current rules of the responsible radiation-control authority always control — we confirm them for your project as part of every design.