Registration Guide

How to Register an X-Ray Machine in Maine:A Simple Step-by-Step Guide

Opening or changing an X-ray facility in Maine can feel confusing. This guide puts the state-level steps, forms, filing links, fees, and contacts in one place.

Get shielding help in Maine

Planning an X-ray project in Maine? Most rooms need a shielding design before registration. Send the floor plan — quotes come back within one business day.

Request a Shielding Design

Heartland Physics can review the project scope and confirm whether its current qualifications and authorization cover any shielding work required for this project. Use the current government sources linked below for registration, plan review, fees, inspections, and filing requirements.

Quick answer

A new Maine X-ray facility submits the initial fee form and the radiation-machine form. Most new rooms need a shielding design accepted by the Radiation Control Program before the machine registration can be processed.

Start here: official forms and filing links

Each blue button opens the exact official form, portal, or state instruction page in a new tab.

What to gather before you start

• Facility and owner information

• Machine manufacturer, model, serial number, type, and installation date

• Room plan, workload, distances, and surrounding-area use

• Qualified expert shielding report

• Installer and inspection records

Step-by-step instructions

Step 1: Get the shielding design accepted

Email the shielding design to Radiation.DHHS@Maine.gov. Maine will issue an RSA number or acceptance letter. The machine registration will not be processed without it when shielding review is required.

Step 2: Complete HHE-804

Use HHE-804 for the initial fee. A new unit is $60. A replacement unit is $30.

Step 3: Complete HHE-805

List the facility, responsible person, equipment, room, and installation information. Add the shielding acceptance information.

Step 4: Send the forms and payment

Mail the complete package to Maine Radiation Control Program, 286 Water Street, 3rd Floor, Augusta, ME 04333-0011. Keep a copy.

Step 5: Arrange the required qualified-expert inspection

For most clinic, private-office, chiropractic, and veterinary installations, arrange the first qualified-expert inspection on the state's required schedule. Keep every report for later inspection and renewal.

Cost

The initial fee is $60 for each new unit and $30 for each replacement unit. Later inspection and renewal obligations depend on facility type.

State contact

Maine Radiation Control Program: Radiation.DHHS@Maine.gov.

Keep these records together

• Submitted application and payment receipt

• Current registration certificate or license

• Shielding design, calculations, and state review letter when applicable

• Installer paperwork, FDA Form 2579 when applicable, acceptance tests, and equipment-performance reports

• Operating procedures, staff training, dosimetry, maintenance, and inspection records that apply to the facility

Important reminder

This guide covers the usual state-level radiation-machine process. Mammography, radiation therapy, mobile use, healing-arts screening, and some industrial systems can have extra approvals. Complete those extra steps when they apply to your equipment.

Official sources

Use the current government sources linked on this page. Requirements, forms, fees, contacts, and procedures can change.

Get shielding help in Maine

Planning an X-ray project in Maine? Most rooms need a shielding design before registration. Send the floor plan — quotes come back within one business day.

Request a Shielding Design

Last updated Aug 21

Next step

Need a shielding design for your project?

Send the basics through the structured request form — we respond within one business day.